(1) Ore must be fed into the middle of the distributor plate, as shown, and it is not allowed to feed the ore directly into crushing chamber. This is because it is easy to overload the crusher and cause uneven wear of the liner.
The correct feeding condition is:
a. The ore is evenly dispers in the crushing chamber through the distributor plate.
b. The ore fed in cannot be higher than the horizontal level of the wall of the mill (as shown in Fig. 1)
(2) The maximum feed size of the crusher must not be equal to the feed opening size, (maximum feed block size ≤ 85% feed opening) otherwise it will lead to:
a. Reduction in crusher production.
b. Damage to certain other parts of the crusher.
(3) The crusher must be started under load, and starting under load will inevitably cause an accident.
(4) When stopping the car, the feeder must be stopped first, and the crusher be stopped after the ore that has entered the crushing chamber is crushed and discharged.
(5) When the crusher is working, the pressure of the locking system and the working of the hydraulic station should be checked frequently, and the problems should be dealt with in time.


+8619303970888